Small and medium production runs from your latest design files

We can start with your first batch after validation or take over a product previously made at another facility. We provide SMT and THT assembly and can also procure components. Every repeat order is based on the current design revision.

Employee in an electronics laboratory beside trays of printed circuit boards.

We take your finished design into repeat production, with every revision under control.

We always start with the latest design files, whoever built the prototype. We then confirm the scope of the first batch.

/ first production run

You are ordering your first production run after prototype validation

The device has passed testing. Now you need a batch for sales, a pilot program, or initial deployments.

/ changing manufacturers

You are transferring production from your current manufacturer

We start with the current BOM, Gerber files and Pick and Place file. We review the documentation, then confirm the revision and the cost of setting up your project on our line.

/ repeat batches

You order repeat batches as demand changes

Order volumes and frequencies may fluctuate throughout the year. Before each batch, we review the latest revision and verify component availability.

/ what we offer

Choose the production scope, from PCBA assembly to a finished device.

You can order assembly alone or include component procurement and box building. Before starting, we confirm the scope for the specific revision and batch.

SMT and THT assembly within an ISO 9001:2015-certified process

AOI inspection takes place off-line, on a separate machine. We use off-line X-ray inspection for QFN and BGA packages. Functional testing is performed once the scope is agreed and we have received the tester and instructions.

Two black printed circuit boards with pins, USB connectors and electronic components.
A person holding an electronic device at a table with similar devices.

Box building

We combine the PCBA with the enclosure, wiring and other parts of the device. Before starting, we confirm the required operations and who will supply each material.

Manufacturability consultation icon

PCB manufacturability consultation

We evaluate the finished design from the perspective of our production line and identify potential assembly risks.

Component procurement icon

Component procurement

We review your BOM and work with a network of more than 18 suppliers. We coordinate component procurement with the assembly schedule.

/ process

From project handover to production in five steps.

The first order involves preparing the design for our production line. For subsequent batches, we refer back to the agreed-upon scope and verify what has changed since the last revision.

/01

You send the current design files

Upload your BOM, Gerber files, Pick and Place data, quantity variants, and a description of the required scope. If the project has been manufactured before, please indicate the current revision and any testing or inspection requirements.
/02

We confirm the scope of the first batch

We verify whether the documentation is sufficient to prepare a quote. Next, we determine the quantity, assembly technology, component delivery method, and the scope of testing and box building.
/03

We quote assembly and components

We provide a cost breakdown for each specified quantity variant. We determine separately which components you will supply and which will be ordered by Techbit.
/04

We assemble and inspect the batch

We assemble according to the confirmed documentation. AOI inspection takes place off-line, on a separate machine. We use off-line X-ray inspection for QFN and BGA packages. Functional testing is performed within the agreed scope.
/05

We deliver the batch and prepare for your next order

After delivery, you continue working with the same dedicated project manager. Before the next batch, we review what has changed in the design and whether it affects the cost or lead time. There is no need to set up the project again from scratch.

We work with TECHBIT on electronics manufacturing projects. We value their collaborative approach, the team's commitment and their openness to discussing project needs and assumptions. Our experience of working together has been positive, and we are happy to recommend TECHBIT as a PCBA manufacturing partner.

Natan Stec
CTO, Knoocker Sp. z o.o.
/ comparison

Compare the scope of support, as well as the assembly price.

Price is only one factor when changing manufacturers. Check how your supplier will handle the first batch, the next revision and growing order volumes.

Criterion
Manufacturer in Asia
Large Polish EMS
Production runs with no 500-unit minimum
SMT and THT assembly, component procurement, and box building with a single partner
Introducing the next revision before the next batch
Scaling beyond 500 units without changing manufacturers
Production in Poland, shared working hours and the option to visit the factory
Production under EU jurisdiction

Certificate

ISO 9001:2015

Certified quality management system

quality

≥99%

First-pass yield, with no rework

on-time delivery

98%

On-time deliveries

/ FAQ

Questions about small and medium production runs.

Do I need to create a new prototype after changing manufacturers?

There is no one-size-fits-all rule for every project. After reviewing the current files and requirements, we determine whether the initial run at Techbit should take the form of a trial batch or proceed directly to the planned production run.

What is the difference between a small-batch electronics run and a prototype?

A prototype is primarily used to verify the design and test for any necessary adjustments before full-scale production. Small or medium-sized batches are produced with the intent of sales, pilot testing, or regular stock replenishment. While changes are still possible, we confirm the current documentation before each production run.

Can I submit an inquiry without a complete BOM, Gerber files or Pick and Place file?

Yes. You can start with a project description and your contact details. The quotation timeframe starts only after we confirm that your documentation, including the BOM, Gerber files and Pick and Place file, is complete.

Is there a minimum order quantity for small-batch production?

We do not apply a one-size-fits-all threshold for projects. Cost-effectiveness depends on the complexity of the assembly and the setup costs for a specific batch. If you are considering several different quantities, please include them in your inquiry, and we will compare them in our quote.

What affects the price of a small-batch electronics run?

The price depends primarily on the assembly technology, the number of operations, components, and the scope of inspection and testing. Box building and batch size also have an impact. The quote always applies to the specified revision and production volume.

How do I submit a new project revision for production?

Send us the current BOM, Gerber files, and Pick and Place files. Include a brief description of the changes compared to the previous batch. Before starting, we will verify their impact on assembly, components, inspection, price, and lead time.

Techbit's production capabilities in one file

The Capabilities Sheet covers our production equipment, supported technologies, production scope and KPIs. Compare them with your project requirements before sending an inquiry.

Enter your email to proceed to the Capabilities Sheet download. We will use your data to process this request. Details: Privacy Policy
Thank you. You will be redirected to the download page shortly. If the redirect does not work, please click here: Download Capabilities Sheet
Failed to save the address. Please check your connection and try again.
Techbit logo

Capabilities Sheet

checkmark

Production equipment and technologies

checkmark

Production capabilities: pitch, component packages and special processes

checkmark

Quality indicators and certifications

checkmark

Development and investment plans

Send your project today. Get a quote on your desk in 2 days.

Please send your BOM, Gerber files, and Pick and Place data. We will review your request for completeness and confirm the next steps.

Rows of green printed circuit boards in plastic racks in a production hall.
/ high-volume production

With consistent volumes, we plan production around your schedule.

If you are planning orders of over 500 units at a time or 500 units per month, check out our high-volume model. In this model, we work according to a set schedule and can serve as your secondary preferred supplier.